Ownership map

Thirteen stages. One question each.

Buying, bringing in, owning and selling a machine in the order the work happens. Pick a stage to see the information to collect before anyone quotes you a figure, and the guides, records and directories for that step. The address bar keeps your place.

  • 13 stages, 3 phases
  • Deep links: ?stage=
  • Keyboard: arrow keys move along the rail
01

The map

Where are you in the process?

Each stage opens its own checklist and resources. The rail is the home-page order: before you buy, bring it in, own it.

Phase 1 · Before you buy

Stage 3 of 13

Decide what to buy

Does it fit the work, the shop and the budget?

Information to collect

  • Part sizes, materials, tolerances and batch sizes the machine must handle
  • Minimum travels, spindle speed, tool capacity and power, with the source for each requirement
  • Which requirements are confirmed by the record and which still need evidence
  • Every way to get the work done: new, used, retrofit, automate, outsource, keep, wait

Resources

Stage 4 of 13

Know the standards

Which quality, safety and export rules apply?

Information to collect

  • Standards named in your customer contracts and quality system
  • Safety and electrical rules in your jurisdiction
  • Export-control or regulated-industry rules that apply to the parts
  • Which standards the machine documentation claims and the evidence behind each claim

Resources

Phase 2 · Bring it in

Stage 5 of 13

Prepare the floor and space

Will the slab, the doors and the layout take it?

Information to collect

  • Machine mass and footprint from the specification sheet
  • Slab thickness, floor loading and any engineer’s review
  • Door, aisle and ceiling clearances along the route to the pad
  • Service clearances the manufacturer requires around the machine

Resources

Stage 7 of 13

Pay for it

What will it really cost to own, and how is it financed?

Information to collect

  • Machine price and every add-on quoted separately
  • Freight, rigging, electrical, foundation, tooling and training figures
  • Yearly service, warranty, insurance, software and maintenance costs
  • Lender terms: rate, term, down payment and what is excluded

Resources

Stage 8 of 13

Move it

Who lifts it, hauls it and permits the load?

Information to collect

  • Shipping dimensions and mass, and whether the machine ships in one piece
  • Rigger and carrier quotes with insurance named
  • Permits for the route and the load
  • Who is responsible at each hand-over point

Resources

Stage 9 of 13

Install and accept

Level, running and proven before you sign off?

Information to collect

  • Levelling, geometry and test-cut results in writing
  • Which acceptance tests the contract names and who witnesses them
  • Tooling, workholding and probing included in the delivery
  • Training delivered and the people who received it

Resources

Phase 3 · Own it

Stage 11 of 13

Solve a problem

Something is wrong after the purchase. What now?

Information to collect

  • What was promised in writing, and what was delivered
  • Warranty and service terms, response time and exclusions
  • Evidence of the fault: logs, photos, measurements and dates
  • Who can repair this control and this mechanical system locally

Resources

Stage 13 of 13

Start a shop or get parts made

Building a shop, or need parts without a machine?

Information to collect

  • The parts, volumes and tolerances you need made
  • Total installed cost of the equipment a shop would need
  • Supplier quotes with lead time, quality terms and tooling ownership
  • The point at which owning beats buying the parts

Resources

02

Then

Carry the stage into the tools.

What you collect here feeds the decision workspace and the comparison; what you save lands in My research.

The stages are a planning order, not a complete knowledge graph. Linked guides describe common cases; your rigger, electrician, engineer, lender and insurer decide the specifics. Evidence standard