PRODUCTION-READY COST

The machine price is
the first line.

Plan what it takes to buy, move, place, connect, tool, commission and prepare a machine for the work it must perform.

Private browser mathNo accountPrintable worksheet
PRIVATE COST WORKSHEET

Build the acquisition-to-production total.

Enter known amounts and supported allowances. Nothing in this worksheet is transmitted or saved by MBB. Print it or save it as a PDF from your browser.

Known-cost total$0
Known lines0 of 15
Unknown lines15

Total to production, known lines

Unknown

Enter the machine price to see how far the project runs past it.

A zero counts as a deliberate input. Blank lines remain unknown and are excluded. Replace planning allowances with current written provider estimates and verify the exact machine configuration and site before relying on the result.

Where published figures exist

Tax, duty and acquisition fees
Ritchie Bros. buyer transaction fee, USA and Mexico, effective August 1, 2026: 10% at $30,000 or less (minimum $100 per lot); 5.5% over $30,000 to $75,000 (minimum $3,000 per lot); $4,125 flat over $75,000. Documentation fee per titled or registered lot: $125 USA and Mexico, $70 California, $140 Orlando. Source: Ritchie Bros. published buyer fees, USA and Mexico, effective August 1, 2026 (rbauction.com), checked October 29, 2026.
Tax, duty and acquisition fees: independent auctions
Buyer's premium at independent machine tool auctions: 18% on each of the four auctions examined (2014 to 2026). Four sales, not an industry rate; it can rise with payment method or delay. Source: KD Auctions, precision machining closure, lots closed October 6, 2026 (kdauctions.com); Machinery Revolution Inc., BidSpotter terms, auction ended April 27, 2023; Perfection Industrial Sales, BidSpotter terms, auction ended October 26, 2021; Industrial Assets Machinery, BidSpotter terms, auction ended March 11, 2014, checked October 29, 2026.
Removal and preparation; Rigging and final placement
"Unless an item can be carried by hand a rigger must be hired to move your items, no exceptions." The auctioneer did not load and showed no rigging rates; removal closed October 16, 2026. Rigging is not priced at the point of sale, so this line stays unknown until a rigger quotes it. Source: KD Auctions, precision machining closure, lots closed October 6, 2026 (kdauctions.com), checked October 29, 2026.
Contingency and other known costs
Storage past the removal deadline at Ritchie Bros.: $25 per day (USA, Mexico, UAE). Source: Ritchie Bros. published buyer fees, USA and Mexico, effective August 1, 2026 (rbauction.com), checked October 29, 2026.
Every other line
MBB holds no published figure for it. Leave it blank (unknown) until a provider gives you a written estimate.
THE COST STACK

Every number needs an owner and a source.

The useful question is not only “what will it cost?” It is “who verified the scope, on what date, for which exact machine and facility?”

MACHINE

Identity and condition

Year, serial, control, options, inclusions, condition, test rights and the source of every material statement.

Control the exact unit →
MOVE

Removal through placement

Preparation, access, loading, carrier, permits, escorts, custody, unloading and final rigging.

Plan the move →
PRODUCTION

Connect, tool and prove

Foundation, power, utilities, tooling, metrology, software, installation, training and acceptance.

Define acceptance →
GET ESTIMATES DIRECTLY

Ask the providers you choose for written estimates.

MBB does not prepare cost briefs or introduce providers. Use the directories below to request written estimates directly, then enter them in the worksheet.

No transaction role.

MBB is not the seller, broker, lender, contractor, engineer or appraisal firm. MBB accepts no payment and takes no part in any sale.

Short film · MBB Journey Shorts

The machine price is line one

A short animated film from the MBB Journey Shorts series. English captions are included as a track.

MBB Journey Shorts · 27.6 seconds · English captions

The machine price is line one

Bought the machine. Budgeted the project? Power, freight, rigging, site work and tooling deserve their own lines. Build the complete picture before the expensive surprise.

General educational information, not site-specific engineering, safety or financial advice. Verify actual machine, site, installation and operating requirements with appropriately qualified professionals.