GENOS M560-V
Evidence updated : manufacturer videos. How evidence is dated
- Will the floor take it?Floor & foundation
- Who moves it?Rigging
- Is the power ready?Electrical
Weight, footprint and connected load come from the exact unit’s data plate and the builder’s installation manual.
Meet the GENOS M560-V
About the Okuma GENOS M560-V
The Okuma GENOS M560-V is catalogued under Vertical Machining Centers in The Machine Blue Book CNC machine reference library. This entry documents the machine for identification and education; specifications above are compiled from manufacturer and public sources and describe the model, not a specific unit.
Site & utilities
| Electrical | Power inlet 37 KVA, 50 mm² 4C, as printed on the M560-V installation drawing (supply voltage not stated) |
|---|---|
| Compressed air | More than 0.5 MPa; required capacity 500 L/min (ANR); supplied air temperature "should be within +5°C" |
| Required footprint | Actual required footprint 10 m², including maintenance access (machine floor space is in the specifications above) |
Base-configuration values published by Okuma for this model, copied as printed. Options change them, and an older unit may differ: confirm on the machine’s data plate and the builder’s installation documents before you order power, air or rigging.
Source: Okuma GENOS M series brochure, Pub. No. GENOS-M-E-(A)-(17)-300, March 2020, PDF page 10 (printed page 17), M560-V installation drawing; PDF page 5, actual required footprint; read 2026-11-09. Plan it: electrical · rigging · power, air and footprint across 10 machines.
Showroom
Research Okuma GENOS M560-V in the Showroom → — specifications, photos and side-by-side compare.
Related machines
Machinery terms
Manuals & documents
All Okuma manuals and documentation →
Okuma GENOS M560-V: questions buyers ask
How do I plan rigging and installation for a Okuma GENOS M560-V?
Start from the machine's weight, footprint and power from the manufacturer's data and the exact unit's data plate, then line up rigging, foundation and power before delivery. See the machine rigging guide.
Next steps for this machine
- Moving it: Machine rigging: plan the move
- Shipping it overseas: Export packaging and machinery preservation
- Need one short term: Industrial equipment rental
- Financing a purchase: Machinery financing and leasing
- Need a formal value: Machinery appraisers
- Buying before December 31 (US): Section 179 for CNC machines and equipment