PESQUISA INDEPENDENTE SOBRE MÁQUINASOs preços observados são evidências de mercado — não comprovam vendas concluídas nem constituem uma avaliação.
Ir para o conteúdo principal
Inteligência independente sobre máquinas · Pesquisa antes da decisão
THE MACHINEBLUE BOOKPesquisa · Mercado · Propriedade

Espaço de decisão

Decide with the evidence, not the brochure.

Set your requirements and region, check a shortlist and its options against the record, cost every way to get the work done, from freight and rigging to warranty and financing, and leave with a packet you can share. Blank figures stay unknown: the workspace never invents a total.

  • Private browser math
  • Nada é enviado
  • 14 regions · 13 currencies
  • Export any time
01

Requirements

What must the machine do, and where?

Your region sets the currency, the typical power supply and the service directories. Anything left blank stays an open question, not an assumption.

02

Lista de seleção

How does each machine measure up?

Each requirement shows a documented match, a documented mismatch or an unresolved question, with the figure from the record.

Add from the Blue Book explorer
03

Configuration

Options and add-ons, machine by machine.

Mark what the work needs and what each offer includes. Options already seen in that model's listings are flagged.

04

Production paths

Every way to get the work done, every cost.

Tick the paths you are weighing and enter the figures you have. Each cost line links to the matching guide or directory. Quotes beat estimates; blank cells stay unknown.

Detailed cost planner
Cost USD
Acquisition
Machine, retrofit or job price
Options and add-ons
Tooling and workholding
CAM, software and control options
Sales tax, import duty and fees
Logistics
Removal and dismantling
Shipping and freight
Rigging and placement
Transit insurance
Site
Electrician, power and phase conversion
Compressed air, coolant and extraction
Foundation and engineering
Installation, leveling and commissioning
Pessoas
Training and programming
Ramp-up and lost production
Each year
Service contract and support
Extended warranty
Preventive maintenance and parts
Equipment insurance
Software subscriptions
Outsourced parts spend
Timing
Lead time (weeks)
One-time cost
Each year
Three-year view

The three-year view adds three years of yearly cost to the one-time cost, and only when every figure in that path is filled in. Waiting can be the right answer.

05

Financiamento

What it costs to pay over time.

Payments use the one-time cost of each path minus the down payment. Rates and terms come from your lender; tax treatment such as Section 179 is a question for your accountant.

Equipment lenders
FinanciamentoBuy newBuy usedRetrofit or repair current machineAutomate current equipmentOutsource the workWait and keep current setup
Down payment
Annual rate %
Term in months
Payment
06

Open questions

What still needs an answer, and who to ask.

Built from your blank requirements, unresolved checks, options and unquoted costs. Take it to sellers, riggers, electricians, engineers, insurers and lenders.

    Who to call

    07

    Decision packet

    Keep it, share it, come back to it.

    Saved only in this browser. Download the packet to share it, or the data file to pick up where you left off on another device.

    Planning arithmetic from the figures you enter. It is not a quote, an appraisal, or engineering, tax or financial advice. Kit de decisão para máquinas usadas · Guia de inspeção · Metodologia