The machine price is
the first line.
Plan what it takes to buy, move, place, connect, tool, commission and prepare a machine for the work it must perform.
Build the acquisition-to-production total.
Enter known amounts and supported allowances. Nothing in this worksheet is transmitted or saved by MBB. Print it or save it as a PDF from your browser.
A zero counts as a deliberate input. Blank lines remain unknown and are excluded. Replace planning allowances with current written provider estimates and verify the exact machine configuration and site before relying on the result.
Every number needs an owner and a source.
The useful question is not only “what will it cost?” It is “who verified the scope, on what date, for which exact machine and facility?”
Identity and condition
Year, serial, control, options, inclusions, condition, test rights and the source of every material statement.
Control the exact unit →Removal through placement
Preparation, access, loading, carrier, permits, escorts, custody, unloading and final rigging.
Plan the move →Connect, tool and prove
Foundation, power, utilities, tooling, metrology, software, installation, training and acceptance.
Define acceptance →Need the scope organized around a real machine?
Send the exact machine, facility location and decision. MBB will review the request by email and define what can be supported with public evidence and qualified-provider estimates.
MBB is not the seller, broker, lender, contractor, engineer or appraisal firm. MBB currently receives no payment merely because a provider is listed. If a future introduction or relationship is compensated, that relationship will be disclosed where it applies.