A permit authorizes
a configuration and a route.

Changing the tractor, trailer, axle spacing, load dimensions or route can change the analysis and may invalidate the movement authority.

Primary sourcesFDOT and Florida Statutes
Route-specificConfiguration and road control
Local authorityMay require separate approval
Reviewed2026-09-28
DECISION SNAPSHOT

Start with the controlling facts.

This guide organizes official sources and machine-specific questions. It is not a permit, route approval, engineering analysis or legal opinion.

Official systemFDOT Permit Application System (PAS)
Route toolsGIS routing, posted bridges, weight maps, project maps and FL511
Self-issue ceilingFDOT publishes dimensional and weight limits for eligible PAS Trip permits
FLORIDA REQUIREMENTS

Published PAS self-issue limits

  • FDOT currently states that eligible Trip permits may be self-issued through PAS using its GIS feature.
  • Published ceilings are 16 feet wide, 18 feet high, 150 feet long and 200,000 pounds.
  • FDOT publishes a separate 140,000-pound ceiling for self-propelled equipment.
  • These ceilings do not guarantee a route, permit or self-issue result for a particular load.
MACHINE-MOVE CONTEXT

Route diligence before dispatch

  • Confirm origin and destination addresses are compatible with the planned approach.
  • Review posted bridges, construction, vertical clearance and weight-restriction resources.
  • Identify local streets, toll facilities, ports and private-property access outside FDOT's authority.
  • Recheck FL511, weather, closures and the permit immediately before movement.
WORKFLOW

Turn the facts into a controlled move.

Every handoff should have a named owner, a source document and a stop-work condition.

Create the loaded configuration

Use actual tractor, trailer, axles, axle spacing, loaded dimensions and weights.

Enter the route request

Use precise origin, destination and route inputs in the official system.

Resolve restrictions

Address bridge, clearance, construction, local-road and movement-condition issues.

Control changes

Do not substitute equipment or deviate from the authorized route without confirming authority.

PRIMARY SOURCES

Verify the current rule at the source.

Dates, route restrictions, bridge conditions and permit procedures can change. Use the current official material for the actual movement.

Educational planning layer only.

Machine Blue Book does not issue permits, calculate a legal route, certify a carrier or decide whether a load is divisible. The applicant, carrier and governing authorities control those determinations.

FLORIDA PERMIT RESEARCH

Return to the complete Florida hub.

Connect dimensions, weights, routing, movement conditions, local authority and the receiving-site plan in one research path.