Abschnitt 1 · Vor dem Kauf
Stufe 1 von 13
Was genau ist sie, und was kann sie?
Zu sammelnde Informationen
- Make, model, generation and serial-number range
- Control make and software version on the exact unit
- Published specification sheet for that generation (not a newer one)
- Machine type and the process it is built for
Ressourcen
Stufe 2 von 13
Zu welchen Preisen wurden vergleichbare Maschinen angeboten?
Zu sammelnde Informationen
- Published asking prices for the same model and year range
- Condition, hours and options on each comparable
- Date of each price and whether it is an ask or a sale
- Currency and the region of each listing
Ressourcen
Stufe 3 von 13
Passt sie zu den Aufträgen, zum Betrieb und zum Budget?
Zu sammelnde Informationen
- Part sizes, materials, tolerances and batch sizes the machine must handle
- Minimum travels, spindle speed, tool capacity and power, with the source for each requirement
- Which requirements are confirmed by the record and which still need evidence
- Every way to get the work done: new, used, retrofit, automate, outsource, keep, wait
Ressourcen
Stufe 4 von 13
Welche Qualitäts-, Sicherheits- und Exportvorschriften gelten?
Zu sammelnde Informationen
- Standards named in your customer contracts and quality system
- Safety and electrical rules in your jurisdiction
- Export-control or regulated-industry rules that apply to the parts
- Which standards the machine documentation claims and the evidence behind each claim
Ressourcen
Phase 2 · Ins Haus holen
Stufe 5 von 13
Tragen Bodenplatte, Tore und Hallenlayout die Maschine?
Zu sammelnde Informationen
- Machine mass and footprint from the specification sheet
- Slab thickness, floor loading and any engineer’s review
- Door, aisle and ceiling clearances along the route to the pad
- Service clearances the manufacturer requires around the machine
Ressourcen
Stufe 6 von 13
Spannung, Phasen, Anschlussleistung, Druckluft und Kühlmittel bereit?
Zu sammelnde Informationen
- Voltage, phase and frequency the machine is built for
- Full-load current or kVA, and what the panel can supply
- Compressed-air pressure, flow and quality required
- Coolant, extraction, chip handling and network needs
Ressourcen
Stufe 7 von 13
Was kostet der Betrieb wirklich, und wie wird finanziert?
Zu sammelnde Informationen
- Machine price and every add-on quoted separately
- Freight, rigging, electrical, foundation, tooling and training figures
- Yearly service, warranty, insurance, software and maintenance costs
- Lender terms: rate, term, down payment and what is excluded
Ressourcen
Stufe 8 von 13
Wer hebt sie, wer transportiert sie, und wer genehmigt die Ladung?
Zu sammelnde Informationen
- Shipping dimensions and mass, and whether the machine ships in one piece
- Rigger and carrier quotes with insurance named
- Permits for the route and the load
- Who is responsible at each hand-over point
Ressourcen
Stufe 9 von 13
Ausgerichtet, in Betrieb und nachgewiesen, bevor Sie abzeichnen?
Zu sammelnde Informationen
- Levelling, geometry and test-cut results in writing
- Which acceptance tests the contract names and who witnesses them
- Tooling, workholding and probing included in the delivery
- Training delivered and the people who received it
Ressourcen
Phase 3 · Betrieb und Besitz
Stufe 10 von 13
Wer betreut sie, und ist ihre Historie dokumentiert?
Zu sammelnde Informationen
- Maintenance schedule from the manual and who performs each item
- Service history, repairs and spindle history on file
- Who supports the control, and until when
- Spare-parts lead times for the items that stop production
Ressourcen
Stufe 11 von 13
Nach dem Kauf stimmt etwas nicht. Was nun?
Zu sammelnde Informationen
- What was promised in writing, and what was delivered
- Warranty and service terms, response time and exclusions
- Evidence of the fault: logs, photos, measurements and dates
- Who can repair this control and this mechanical system locally
Ressourcen
Stufe 12 von 13
Was bleibt Ihnen nach Gebühren und Abbau tatsächlich?
Zu sammelnde Informationen
- Published asking prices for the same model and year
- Hours, condition, options and service records a buyer will ask for
- Removal, rigging and transport costs you will bear
- Fees and commission under each sale route
Ressourcen
Stufe 13 von 13
Bauen Sie einen Betrieb auf oder brauchen Sie Teile ohne eigene Maschine?
Zu sammelnde Informationen
- The parts, volumes and tolerances you need made
- Total installed cost of the equipment a shop would need
- Supplier quotes with lead time, quality terms and tooling ownership
- The point at which owning beats buying the parts
Ressourcen