独立的机床研究观察到的价格是市场证据——不是成交证明,也不是评估。
跳至主要内容
独立的机床情报 · 先研究,再决定
THE MACHINEBLUE BOOK研究 · 市场 · 持有

持有路线图

十三个阶段,每个阶段一个问题。

按工作发生的顺序,涵盖机床的购买、引进、持有和出售。选择一个阶段,即可查看在任何人给您报价之前需要收集的信息,以及该步骤对应的指南、记录和名录。地址栏会保留您当前所在的位置。

  • 13 个阶段,3 个环节
  • 深层链接:?stage=
  • 键盘操作:方向键可沿导轨移动
01

路线图

您处在流程的哪一步?

每个阶段都有各自的检查清单和资源。导轨按首页顺序排列:购买前、引进、持有。

第 1 阶段 · 购买前

第 1 阶段,共 13 阶段

识别机床

它究竟是什么,能做什么?

需收集的信息

  • Make, model, generation and serial-number range
  • Control make and software version on the exact unit
  • Published specification sheet for that generation (not a newer one)
  • Machine type and the process it is built for

资源

第 3 阶段,共 13 阶段

决定购买什么

它是否适合加工任务、车间和预算?

需收集的信息

  • Part sizes, materials, tolerances and batch sizes the machine must handle
  • Minimum travels, spindle speed, tool capacity and power, with the source for each requirement
  • Which requirements are confirmed by the record and which still need evidence
  • Every way to get the work done: new, used, retrofit, automate, outsource, keep, wait

资源

第 4 阶段,共 13 阶段

了解标准

适用哪些质量、安全和出口规则?

需收集的信息

  • Standards named in your customer contracts and quality system
  • Safety and electrical rules in your jurisdiction
  • Export-control or regulated-industry rules that apply to the parts
  • Which standards the machine documentation claims and the evidence behind each claim

资源

第 2 篇 · 引进设备

第 5 阶段,共 13 阶段

准备地面与空间

地坪、门洞和布局能否容纳?

需收集的信息

  • Machine mass and footprint from the specification sheet
  • Slab thickness, floor loading and any engineer’s review
  • Door, aisle and ceiling clearances along the route to the pad
  • Service clearances the manufacturer requires around the machine

资源

第 7 阶段,共 13 阶段

支付费用

持有它的真实成本是多少,如何融资?

需收集的信息

  • Machine price and every add-on quoted separately
  • Freight, rigging, electrical, foundation, tooling and training figures
  • Yearly service, warranty, insurance, software and maintenance costs
  • Lender terms: rate, term, down payment and what is excluded

资源

第 8 阶段,共 13 阶段

搬运机床

由谁吊装、运输并办理载荷许可?

需收集的信息

  • Shipping dimensions and mass, and whether the machine ships in one piece
  • Rigger and carrier quotes with insurance named
  • Permits for the route and the load
  • Who is responsible at each hand-over point

资源

第 9 阶段,共 13 阶段

安装与验收

签字验收前,是否已调平、运行并经过验证?

需收集的信息

  • Levelling, geometry and test-cut results in writing
  • Which acceptance tests the contract names and who witnesses them
  • Tooling, workholding and probing included in the delivery
  • Training delivered and the people who received it

资源

第 3 篇 · 持有与使用

第 10 阶段,共 13 阶段

运行与维护

由谁提供支持,其历史是否有记录?

需收集的信息

  • Maintenance schedule from the manual and who performs each item
  • Service history, repairs and spindle history on file
  • Who supports the control, and until when
  • Spare-parts lead times for the items that stop production

资源

第 11 阶段,共 13 阶段

解决问题

购买后出现问题,该怎么办?

需收集的信息

  • What was promised in writing, and what was delivered
  • Warranty and service terms, response time and exclusions
  • Evidence of the fault: logs, photos, measurements and dates
  • Who can repair this control and this mechanical system locally

资源

第 13 阶段,共 13 阶段

创办车间或外包加工零件

正在建车间,或无需机床就想获得零件?

需收集的信息

  • The parts, volumes and tolerances you need made
  • Total installed cost of the equipment a shop would need
  • Supplier quotes with lead time, quality terms and tooling ownership
  • The point at which owning beats buying the parts

资源

02

然后

把本阶段带入工具中。

您在此收集的信息会进入决策工作区和对比功能;您保存的内容会存入“我的研究”。

这些阶段只是一种规划顺序,并非完整的知识图谱。所链接的指南介绍的是常见情形;具体事项应由您的吊装搬运人员、电工、工程师、贷款机构和保险公司决定。 证据标准